investment plan Investment plan - Electricity The distribution system operator adopts the plan of investments into the distribution system every year for the period of three years which is harmonised with the plan of investments into the transmission system.
iplan for the transfer of metering devices Plan for the transfer of metering devices - Electricity Every year, the distribution system operator adopts the plan for the transfer of metering devices in the facilities of existing customers, i.e. producers. In line with the Energy Law (Article 404), the distribution system operator is obliged to take over all the metering devices, metering switchboards, lines, installations and equipment in the metering switchboards by 31/12/2020 at the latest.
Distribution system development plan will be available here after it is submitted by the system operator and adopted by the Agency.
Transmission Network Code
Cross-border transmission capacity allocation
Ten-Year Transmission System Development Plans
Exemptions for new interconnectors in the field of electricity
Distribution system development plan
Compliance programme of the distribution system operator