  • Should customs duties be paid for import/export of electricity in/from the Republic of Serbia?
  • Do I have to pay for the transit of electricity through the transmission network of the Republic of Serbia? How can I book the transmission capacity on interconnected power lines in the Republic of Serbia?
  • Under Article 10.1.3 of the “Rules on Cross-border Transmission Capacity Allocation of the public enterprise for electricity transmission and transmission system management „Elektromreza Srbije“ (PE EMS) for PE EMS control area borders for the period 01/01 – 31/01/2012”, curtailment might take place "due to the scheduled annual disconnections of the cross-border interconnection lines for regular maintenance, due to Force Majeure or other unplanned/unforeseen events in the electric power system." This notion of "unplanned/unforeseen events” is not defined in the rules and could cover a broader category of events for which curtailment might be possible, and there is a risk that it might go beyond the "emergency situations where the transmission system operator must act in an expeditious manner and re-dispatching or countertrading is not possible" which are in fact the only possibility for curtailment allowed by the Regulation 1228/2003 (Article 6(2)). Please clarify the notion of "unplanned/unforeseen or unscheduled events" (other than Force Majeure) in Articles 10.1.3, 10.1.7 and 10.2.3 of the Allocation Rules for 2012.
  • Article 10.1.8 of the “Rules on Cross-border Transmission Capacity Allocation of the public enterprise for electricity transmission and transmission system management „Elektromreza Srbije“ (PE EMS) for PE EMS control area borders for the period 01/01 – 31/01/2012” provides for a definition of Force Majeure by stipulating that "Force Majeure events and circumstances are those which could not be foreseen, prevented, avoided or eliminated by the measures undertaken to preserve safe and reliable operation of the electric power system, compliant with the Grid Code and which took place after the Allocation Procedure and in particular natural disasters, fires, flood, earthquakes, state of emergency and warlike operations as well as the measures of the state authorities and organizations of the transmission system operators." This definition of Force Majeure includes "measures of the state authorities and organizations of the transmission system operators", which would seem to constitute rather the reactions to an emergency situation than the emergency situation itself. Please specify which measures of the state authorities and organizations of the transmission system operators in Article 10.1.8 of the Allocation Rules for 2012 could be considered Force Majeure. Please clarify if only measures required as an expeditious reaction to emergency situations can trigger capacity curtailment.
News
APPROVAL OF RULES REGULATING PROCEDURE AND METHOD OF TRANSMISSION CAPACITY ALLOCATION BETWEEN BIDDING ZONES

BELGRADE, Friday, November 29, 2024.

On the session held on November 28, 2024, the Council of the Energy Agency of the Republic of Serbia has approved rules regulating the procedure and method of transmission capacity allocation on borders between bidding zones of the transmission system operator of the Republic of Serbia (EMS AD) and the transmission system operators of North Macedonia (MEPSO), Romania (Transelektrika), Bosnia and Herzegovina (NOSBiH), Bulgaria (ESO), Croatia (HOPS) and Montenegro (CGES) for 2025. 


APPROVAL OF NATURAL GAS DISTRIBUTION SYSTEM OPERATOR DEVELOPMENT PLAN OF “YUGOROSGAZ” JSC BELGRADE

BELGRADE, Thursday, October 17, 2024.

On the session held on October 17, 2024, the Council of the Energy Agency of the Republic of Serbia has adopted a decision on the approval of the Distribution System Development Plan for 2024-2028 with the investment plan for 2024-2026 which was submitted to the Agency by the natural gas distribution system operator “Yugorosgaz” JSC Belgrade.

The plan envisages the natural gas distribution system development in line with the customers’ connection demand.


APPROVAL OF NATURAL GAS DISTRIBUTION SYSTEM OPERATOR DEVELOPMENT PLAN OF PUBLIC UTILITY COMPANY “STANDARD”, ADA

BELGRADE, Friday, October 11, 2024.

On the session held on October 9, 2024, the Council of the Energy Agency of the Republic of Serbia has adopted a decision on the approval of the Distribution System Development Plan for 2024-2028 with the investment plan for 2024-2026 which was submitted to the Agency by the natural gas distribution system operator PUC “Standard”, Ada.


Тitle 2

Short news


CERTIFICATE OF INDEPENDENT SYSTEM OPERATOR TO TRANSPORTGAS SRBIJA NOVI SAD

BELGRADE, Thursday, July 25, 2024.

Acting upon an application of the Limited Liability Company TRANSPORGAS SRBIJA Novi Sad, on the session held on July 25, 2024, the Council of the Energy Agency of the Republic of Serbia has adopted a preliminary Decision on issuing a certificate to the TRANSPORTGAS SRBIJA Novi Sad as to an independent system operator.