In line with the Energy Law (“Official Gazette of RS”, No. 145/14 and 95/18 –another law) (Article 250), the transmission system operator submits the ten-year transmission system development plan for the approval to the Agency in line with the Strategy and the Program, bearing in mind planned natural gas production, consumption and exchange with other countries as well as the results of consultations with interested parties.
The ten-year transmission system development plan should:
The Agency organises consultations on the ten-year plan with existing and potential system users and checks if the ten-year plan includes the whole investment demand which was set in the consultation procedure.
The Agency observes and estimates the realisation of ten-year development plans. In case the transmission system operator does not realise an investment the operator was supposed to realise in three years time according to the plan, in order to have planned investment realised, the Agency may take some of the following measures:
Once ten-year development plans are submitted by the system operator ad adopted by the Agency, they will be available here.
The „Report on Indicators of Unit Investment Costs and Relevant Reference Levels for Electricity Infrastructure Projects“ which was prepared by the Energy Community Secretariat can be used for the preparation of the Ten-Year Transmission System Development Plan.
Ten-Year Transmission System Development Plans
Programme for Provision of Non-Discriminatory Behaviour of the Transmission System Operator
Exemptions for new natural gas infrastructure
Distribution system development plan
Non-Discrimination Programme of the Distribution System Operator